Since there are deficiencies in the inspection data that is Attachment 1) to the "process change application form", and you may be asked by the re-submission.
2) production preparation is not completed, some glitches are to that also found in the standard class, the first place, (THAILAND) YMP PRESS & DIE is a sold-to party
for findings CO., of LTD. has not been able to measure , I do re-confirmation at the time they were completed.
Pipe length of 3) material whereas the 180mm originally, it was briefed to have to try a thing of 200mm now, but the picture with different conditions and mass-produced product
that was Lai is invalid as a test data .
การแปล กรุณารอสักครู่..
