Maeda like, Thank you for your help.
Also Thailand frame, Inc., has been asked to consult again, the timeline of this delivery, because the delivery time that is based on the careful calculation close to the maximum production capacity of the plant, faster little by little in the day-to-day operations it may or may not be possible, so I heard not spared the maximum effort, is so that the only dramatic change change as they say Maeda like leaves do not think at this stage.
It therefore, PO of Shipping date is, in the next three described
kindly thank you.
1 flight: 2,000 set September 10.
2 flights: 2,000 set September 27 days.
Three flights: 2,500 set October 10.
การแปล กรุณารอสักครู่..
