1 ) campus passage surface repair
2 ) work place areas floor paint
3 ) white repair
4 ) thorough floor cleaning tool orientation
5 ) dumpster (a box before the flood) repair
6 ) big cleaning, MC clean, 5 s
7 ) floors, heights, wall display of various review
8 ) unused wiring pipe removal of the secondary side
9 ) main conveyor cleaning
10 ) vendor broken returnable destroyed
11 ) Dolly floods after update of unpainted, wooden
12 ) campus carry box repair
FC STA's
1 ) suburban corridors, building repair
2 ) suburban passage paint repair
3 ) removal of unused wiring plumbing in the building
4 ) high-speed shutter cleaning, etc.
PE Iwase (AH cooperation)
1 ) flood evacuation label maintenance (repairs, extra etc)