Hi Morota-san Sorry for Japanese answers of silver pair protrusion and PZT displacement (1) I agree. However, 2) Reject if gap between PZT encapsulate and support-bridge larger than support-bridge width does not have this standard memory you have taught. Attached PDF me what was shifted those that get lost you there as measured by the tool microscope. Although it is material of GRR, 16 th (NCA spatter) and 18th (Excess ECA) I think that may be a OK as long as you look at the photos. Flying dust of insulation size 400μ following three following things. As or smaller than half of the 0.8 hole on the boss hole. . . . Silver pair protrusion, your Hi Morota-san with standard attachments Sorry for Japanese silver pair protrusion and PZT displacement of (1) answer is favor. However, 2) Reject if gap between PZT encapsulate and support-bridge larger than support-bridge width does not have this standard memory you have taught. Attached PDF me what was shifted those that get lost you there as measured by the tool microscope. Although it is material of GRR, 16 th (NCA spatter) and 18th (Excess ECA) I think that may be a OK as long as you look at the photos. Flying dust of insulation size 400μ following three following things. As or smaller than half of the 0.8 hole on the boss hole. . . . The silver pair protruded, I've leave standard attachments and I think whether may be a OK so Marginal OK to have to go to the top of the Furekiamu. More, thank you. The Chika but came to think whether may be a OK so Marginal OK to have to go to the top of the Furekiamu. More, thank you. Chika
การแปล กรุณารอสักครู่..