ii) Monthly report "lactam recovery from the oligomer waste and scrap nylon 6" (Matsumoto attendant)
progress report each of the catalyst screening, purification consider, for the pilot facility
and purification methods consider
the yield of crystal cleaning? → 50% about
pilot equipment
(one-tenth of the actual equipment) 100L scale be considered as a scale too large → 30L. Asked to consider Production Engineering C G nylon for equipment cost
installation location of the pilot facilities? → (laws and regulations often in Japan, installation space ensure difficult) to consider the axis Thailand
feed how OLU to the pilot facilities? → turned on by crushing, etc. crusher
at the thought of the future, I want you to consider in such facilities put the polymer balls and pellets
recovered destination of Lc obtained by depolymerization? → I proceed with the examination of two ways and return to the factory Lc, and to consume a total nylon factory