History of details I not been able to track, but
during the corresponding sequential, suddenly, is there is a prototype indication of each preceding 150pcs in Config-B, and we cope with the highest priority the Config-B and Config-A were.
Then, shift as it is member of Config-B, began the main build and rushed to the Config-K. things config-A is, seems to have been placed. It should be noted that the specification of Config-A/B/K is that all together, the other day, talking to the sales staff of LCM, or not than there is no need to re-delivery of config-A. . . (Config-A is the just a mini build but, after all, that of delivery already, Config-K of Main build and 150pcs of Config-B or dont need another already in the change of Colo) I am sorry, 32pcs of each config-A or will we need after all delivery of mini build? (It is not already SCI canceled, or if the remaining samples of the config-B / K of this specification, it is probably also available)
การแปล กรุณารอสักครู่..
