- Including Exterior construction.
- That of anemometer mounted on the roof. Alarm departure report in the machine room and the ground floor at 20m / s or more of the wind speed.
※ to be able to install the following equipment in the machine room.
Fried-duty hoist crane: 1 set (basement-machine room)
installed, 10-ton hoist crane in the machine room. (Installed on a tower block)
under hook height (from the machine room floor): be not less than 3m
การแปล กรุณารอสักครู่..