Cheers for good work is. I think first, the NMB is (Demand) order quantity, and may be reported in the DRP-compliant P / O of Kanokon-san. Only, because it is Demand from the NMB, if Hi-P does not follow it, you may be Bal adjustment. Why, whether out in Hi-P its Demand quantity, and those that have followed the instructions in the BM POM. It has been requested as a backup for the NMB made Pin-submarine of Mini build, has not issued P / O of 3Kpcs;: 1. Pin-Horn 2. Pin-side: config and other Config-C favorite for Main build It will be the sum of the backup of NMB-made pin-sub / pin-pin of, and we have been requested in 35Kpcs. and (13.5Kpcs that POM instructed'm made in the calculation of only Config-C of the favorite, other backups does not reflect) if, if backup unnecessary, pin-side is it is sufficient 13.5Kpcs . (I want to say that the white re-correction instructions to match it also BM)
การแปล กรุณารอสักครู่..
