The use of
● at Thai Tohken counter washing test on the test conditions
■ US washing machine: WS 600, constituted by WS 600 40
● rough cleaning (cleaning test T strong alkali S 400) has WS swing at 600 to rinse for rust prevention, C) WS at 600. Batch number 1: 40
● 12 in use ()
● punching cage cleaning: cleaning liquid S 400 T (alkali) dilution and heating cleaning: cleaning tact
● 60 degrees ten minutes WS 600 (28) is enshrined in 5 minutes, rinse cleaning rust conditions of perfect WS 600 (40 )
■ customerDiesel fuel injection by the injector (length × 150 mm. Phi Phi projection 15, 20 mm) of carburization inhibitor removal
● now bubbling washing cleaning by wiping the inner diameter (washing) residue in high pressure spray antirust agent is immersed in liquid
⇒ air blow by workers of oil temperature (60. Degree. Residue removal is enshrined in reservoir using liquid packing
● HTS squirrel threatened to cut, ultrasonic cleaning machine, RIS CUT SZ 82) at the NS manufacturer Co., Ltd. all rights reserved NR Daphne super coating manufacturer, Idemitsu Kosan Co.And a carbonaceous material by use of carbon or carbon N Buster 221 Buster 141 solution heat treatment process) to replace all of the frequency of using heat treatment technology manufacturer Parker bubbling tank 30.
⇒ 864 pieces lot lot 30 × 25, oil removal process in heat treatment process at the following
● squirrel cut too at 50 percent RO water temperature at 70 ℃ in water displacement at each vacuum cleaning machine in the steel material, including the following removal of Daphne super coating NR 920 (100% in the cleaning liquid cleaner SH at Idemitsu Kosan, including the followingRemoval of residual carbon material for ultrasonic cleaning (hope) in the present work, including work at the final polish ↓ ↓. At the Packing rust prevention and the ultrasonic cleaning machine is introduced by an operator, a lot of time (in) a lot in 18 day = 15, production process 552 day at the target. Under the work 24 hours / day 360 years wiping or bubbling process to the inner diameter of the work process, the residue left after the US cleaning process. The MAX 500 million budget at about 1 million yen THB, requested by
● contentCurrently about ten workers are cleaning work, so as to reduce the number of workers to reduce labor costs.
■ primary test results and overall consideration too clean, carburization inhibitor of the screw groove of the work process of the most concern to the customer can be removed. In the cloth can not be removed by the carburization inhibitor from the residue after the coating is fixed as well as the days passed and the probable cause. First of all, the customer to our views onAfter washing to work. In order to reduce the dirt on the proposed plan to
● cleaning device is composed of
① rough cleaning to cleaning rust finish drying. Rinse rinse tank.
② rough cleaning rust to rinse dried without drainage (customer)
การแปล กรุณารอสักครู่..
![](//thimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)