Improvement project plan for circuit image DES line.
Power off improvement:
-Replace cables cause insulation is low value for motors and sensor equipment.
-Reconnecting wiring control on control cabinet and joint connection.
-Install air condition control cabinet protection electric equipment.
Motor pump improvement:
-Coating resin for motor pump before install.
-Monitoring result and set period overhaul.
Conveyor improvement:
-Replace part worn-out.
-Order special part for support PM.
-Monitoring result and set period part change.
-Adjust speed conveyor so that syncronize between machine.