Iwamatsu customers
Hirayama customers it will care. Another there is hope. By diluting the hardener it's small portions but it has caused a gelling accident at the time of the rainy season every year. We have to perform the nitrogen purge at the time of filling, but ask the guidance of measures to prevent the contamination of water. Certainly Gunma factory Although we recognize that outsource, tank at the subcontractor, if possible (but probably think kettle of fixed), filling device, N2 purge method, measurement N2 amount at the time of N2 purge? (Properly purge that has been one of the verification method) and I have heard that quality standards (water content, etc.) later, the Saitama factory there is a thing that can be moved in a closed tank. Such do you if there is a tank ready photos and drawings and the like? It is considered to be introduced here. Do you go in CO2 purge in addition to N2 purge? The batch size we're going in the 345kg and 800kg. Nice to meet you. Kikuchi
การแปล กรุณารอสักครู่..
