Always I am indebted. Our survey, measures are late, I am sorry. Matter of black powder that occurred in the P2 trial of TBC dono for coating End material, is the research status of the street of the accompanying drawings. There is also talk of that becoming TBC dono other material is also less, first survey the situation by e-mail, we made suggestions on the way forward, we will contact you. This black powder generation is some of the earlier than experience under the name of cutting edge rough. Aluminum of the outer peripheral part of the lid and the molding resistance is large for reasons of bad such a slip of the surface at the time of the shell molding becomes difficult to enter in the direction of the counter shell, unit depth is reduced, the greater the results Karl before the lid, the lid edge is believed to be rubbing the mold powder comes out. Although this time is no lid before curling, lid and after curling, from the results of the slipperiness of the surface of the plate, I have estimated that such a cause. However, Why molding resistance is increased (may not only slip) to For other material, P1 material or of UATH, not so big difference, even in comparison with the OK material of P2, it was clear cause we do not grasp the. P2 material has three manufacturing chance so far, but it was also changing the conditions on our side to not, do not seem to have also changed much a result of the finished, the cause is unknown. In addition, P1 and material strength and thickness, etc. In P2, the part about the aluminum are made in much the same, we do not believe there is a cause to the material of something P2. From the customer at the moment OK, the results got the contact of NG in the list together with our manufacturing performance and I think if you can see because it. Since the cause as our company is unknown currently, first want to let me advance the following three, we would like to propose to the TBC dono. 1. P2 and I have you return the coil that 107909-210 that became NG next pending trial, to continue the investigation. 2. On the other hand, already manufactured, or P2 material already delivered, our second time, the third of manufacturing chance I have you use something as n widening in TBC buttocks, and get to our technical staff also allowed to attend. 3. Newly manufactured the production of P2 material in wax amount upper limit aim (in order to improve the lubricity even a little bit), which is also I would like your assessment at TBC dono. Thank you. Or more
การแปล กรุณารอสักครู่..
