To whom it may concern too on November 26, DSTT star Thailand made PGG (RB 01), the length of the short 0.6 about color mm found work. At the place of STAR history, 12 may be at a total lack of color in the PGG trouble following the arrival in Japan. Was too, please practice the following in Harima LOT sorting. The detailed content of trouble are as follows. To prevent the recurrence of now, butThank you for your cooperation. I'm sorry, but stress about the sorting costs, then please give your request. At the time of selection and confirm the quantity balance, when there is a problem with your wish, we will contact you to me ASAP. If you have any questions, sorry to trouble you, but please to Yamaji. A selection object stress at the PGG: A at 300 LOT number: S 24 at the target quantity Y 181: Ltd has postponed its planned new share one.Note: in the manual feeding bar under the long, long cutting part, and might not NG. 2 please contact us at the sorting method at a later date. At length I think to ask for NG length measurement. 3 NG point at the side of the connector, there is a possibility that there is a lack of the overall length of the short side. At this point NG found it too is as follows. At the point at NG 13.6 ± 1.0 mm 0.1, Actual data 13.037 at 2.7 mm.6 and 0 mm, 0.1 Actual data 7.087 mm. 3 and 0 mm 3.0 0.1, Actual data 2.477 mm. 4. The stress in the occurrence of troubles in detail NG found at this time. Method: the cause of STAR lathe NC line 601 in September 29 days after the automatic feeding device of bar material NG stopped working. At the time, the manual stop sending the bar material, continued to restart the operation. In the method of sending the goods NG when manually. At the "investigation was carried out in the past, which correspond to the same
【To confirm the results STAR production history, NG device of feeding machine, only 601. The following day, September 8 occurs. At that DSTT production history, PGG during transport to DC may contain the NG products. In this STAR, carried out the inspection, Bali shape. In the course of the inspection discovered two. At present STAR method. At the following measures (on November 28, visit the confirmation)(1) on November 22, sending device (sensor) replacing (2) to review the treatment procedure, November 27, abnormal stop machine tool exchange and also check that there is no problem with the size of the stored data. Production process of DSTT * at the short side, the connector may be through the process. Add at the star, to introduce the total length. (management tool)
การแปล กรุณารอสักครู่..
