IAV existing mold and use if you must respond to this type in the RFQ material and Prototype:50 Pcs made in date has not been decided, but the capable by adding molding ring, etc.?
In the RFQ document Prototype: Ali schedule described 50Pcs production is not fixed, a corresponding additional such as molded ring using the IAV existing mold if it is necessary corresponding to up to this type can be Is it possible.
The RFQ materials in Prototype: there are described Pcs production schedule is not fixed, but need to be correspond to the type that was used when the type of the existing IAV molding of molding ring, etc. can be added.