For sharp engineers ring build ( A2-W ) and コントロールラン shed at the same time the request for a Total 2,800pcs. Please check the backlight on for コントロールラン now make or made or not?
For passing at the same time the control run for engineering build and (A2-W), Sharp has requested the Total 2,800pcs. Do not you made or do you make now the backlight of the control run for, Please check
Mechanical Engineering (Building 2 A W) and at the same time, the flow Total 2, are demanding 800 PCs. For the backlight control at run make now is made or not, please confirm it.