Construction on the Yamate Tunnel began in 1992. The Takamatsu – Nishi Shinjuku segment opened on December 22, 2007. On the same date, an above-ground segment linking the tunnel to the Kumanochō Interchange in Itabashi and Toshima also opened. The last section linking Ohashi to the Bayshore Route opened on 7 March 2015.