Yasufuku chief dono we have taken care of. Satomi is of global G. We've look the bottom of e-mail, the following correspondence is required. ① routing configuration of the local router of HVAC (for SIG connection, work to Verizon estimates, orders, advance preparation, implementation work, test) ② routing configuration of the local router of MCCT (for InternetVPN connection, work estimated to KDDI, ordering , advance preparation, implementation work, test) ③ SYMPHONY technical confirmation of the configuration to be set to a dedicated line router (confirmation that there is no impact on the MHI network). You send instructions back off and work procedures be carried out at local to MHI side, and need to be confirmed work of that there is no problem to work. ④ ①② of vendor control, process management, task management, technology confirmation work estimates to Hishitomo Systems ③, ordering you think that the above-mentioned ① ~ can not in your presentation was he was schedule to think the ④. ①, ②, soon obtain it works in the way of me because of immediately estimate acquisition per ④, we will contact you. Since this content is a place that affect the cost and schedule, I think that is a good person who had share as soon as possible and local Numazaki like.
การแปล กรุณารอสักครู่..