(1) mold temperature -on type 1-5 of 5 places x left and right under the type 1-4 of 4 places x measure the right and left ( under type's may have hurt the mold mold inside)... total 18 places/day or running before
① mold temperature measuring four places left and right of × × five left and right of the lower mold 1-4, 1-5 upper mold (lower mold likely have hurt mold mold internal) or ... a total of 18 places / day or pre-production
Of mold temperature at the upper die 5 at left and right lower 1 / 4 × 4 at the left and right under the type of measuring internal mold has the potential to harm the mold, a total of 18 at or before the operation day stress