I'm sorry, Mr. kubosaka too poor to flow out. The other day at the time of the occurrence of MIC control box, the cleaning of the tray and the countermeasures. Call up again today at the meeting, the cleaning process and the mold can be caused because of such measures at follow-up. In the interim, to add to the air blowing process. The lot is well corresponding to the contact QC Satiya engineer. Sugita stress too
การแปล กรุณารอสักครู่..
