Adhesive weight and relationship at that time pressure must be measured and record.
Work instruction sheet PSLC machine of adhesive weight management (PSLC 000 - 3A).
2 ) annual check
implement, annually one time, replacement of the pressure gauge and replace the nozzle and ask to the works Division.
8. Maintenance on API
1 ) daily inspection
scales before the beginning of the work products for measurement of two ( № 2 and № 3 ) inspection by weight.
The record's stating the scale inspection record sheet number.
2 ) annual check
once in 3 years1. jam moving parts lubrication (grease) lubricating condition, grease, hose breakage, or get rid of
การแปล กรุณารอสักครู่..